Project Description
This safety improvement project involved, shoulder widening, milling and resurfacing and drainage improvements. Responsible for drainage conveyance system design to accommodate the shoulder widening. Performed cross drain analysis and ditch calculations ensuring the drainage conveyance system will operate to capacity. Identified areas that are prone to localized flooding and provided drainage solutions to alleviate flooding.