Project Description
This project included 4.2 miles of urban and suburban roadway widening from 4 lanes to 6 lanes and a major reconstruction from Lake Ella Road to north of Avenida Central. This involved designing four retention ponds, major storm sewer design, and an environmental permit with St. Johns River Water Management District. We coordinated closely with roadway horizontal and vertical geometry to make an optimal drainage design. Also executed the maintenance of traffic design and overall QC for the project.